Taylor Lumber
Sheridan, OR

12,000 Sq. Ft.

Architect
Sweet-Edwards / EMCON

"This million dollar project, completed in just six months, was the first of its kind in the Northwest. It was required by new Environmental Protection Agency regulations and consisted of a prefabricated metal building, 8-10T hoist and tray system and a 14", 70' x 180' concrete pad with a lined containment layer and a lined leak detection layer underneath. The pad was required to support tremendous weight, and be constructed to minimize cracking and to avoid leakage to surrounding areas. Colamette met all these objectives, and came in under budget as well. They were easy to work with and exhibited a high degree of professionalism."

-Ken Bernard, Property Manager
A-dec